Dampier fact sheets
|
Introduction The Dampier Archipelago consists of 42 islands and islets close to the western coast of Australia, about 1600 km north of Perth. They vary greatly in size, ranging in land area from 1 ha to 3290 ha. The largest island, Murujuga, was separated from the mainland only by tidal mudflats and connected to it by a causeway built in 1964. Called Dampier Island until 1971, it was then renamed Burrup “Peninsula” after a Roebourne bank clerk. Murujuga is maximal about 27 km long and up to 5 km wide. The Archipelago was named after William Dampier, thought to be the first European captain to see it. Until 1868, most of it was occupied by the Yaburrara, a sub-tribe of the Ngaluma, and frequented by the Ngaluma, Mardudhunera and other tribes of the region. In 1868, the Yaburrara were subjected to almost complete genocide by the colonial government, in a series of horrific massacres occurring over about three months.The Dampier Archipelago is regarded as containing the world’s largest concentration of rock art, comprising at least 600,000 petroglyphs, and very probably well in excess of one million motifs. It also features Australia’s largest corpus of stone arrangements, of which five types occur, numbering in the thousands. It is estimated that the rock art and megalithic structures occupy a total area of at least 8 km2, and this is therefore the world’s largest art gallery, and Australia’s largest cultural monument.Between 1963 and 2004, about 900 rock art sites of the estimated total of 3690 sites on Murujuga (Burrup) have been destroyed by development (1). This represents 24.4 % of the island’s total rock art. A similar proportion of the stone arrangements has also been sacrificed to development. The remaining rock art of the Archipelago is being subjected to slow and gradual destruction through the massive acidic industrial emissions of the petrochemical plants that have been placed there since 1980 because of a series of planning bungles by the government of Western Australia. The most serious aspect of these is the establishment of very large volatile installations in close proximity. The petrochemical precinct of Dampier measures only a few square kilometres, yet the state government intends to cram numerous more plants into this area, in addition to the existing explosive storage there. The explosive energy stored at Dampier 4 LNG tanks, each of 65,000 m3, total 260,000 m3 The LNG is stored below its boiling temperature of -161º C, condensed 600 times. Therefore these 4 tanks have a capacity of 156,000,000 m3 of methane. One m3 of methane represents 37,080 BTUs (British Thermal Units) of energy, therefore these 4 tanks contain 5,784,480,000,000 BTUs when full. One tonne of TNT yields 1,000,000,000 calories, or 3,968,321 BTUs. Therefore one Hiroshima-size atomic bomb, which is 15 kilotonnes of TNT, represents the energy of 59,524,815,000 BTUs. It follows that the LNG stored in the four existing LNG tanks represents up to 97.2 atomic bombs of the size of the Hiroshima Little Boy bomb of 6 August 1945. Since there is also massive energy stored in the remaining 6 tanks, the minimum explosive energy held at the facility can be assumed to total at least the equivalent of 100 Hiroshima bombs, or the equivalent of 1,500,000 tonnes of TNT, at any given time. Planned initial capacity of the Pluto facility The 2 LNG tanks are planned to have a capacity of 192,000,000 m3 of methane, or 7,119,360,000,000 BTUs (2). This therefore corresponds to another 119.6 Hiroshima bombs, excluding the condensate, propane, butane, light oil and hydrogen tanks. Depending on how full the tanks are, it can be assumed that the minimum equivalent of 120 Hiroshima atomic bombs (or 1,800,000 tonnes of TNT equivalent) will be stored there at any given time. It is planned to locate the Pluto plant next to the existing Northwest Shelf LNG plant. Other volatile installations at Dampier In 2005, the Burrup Fertiliser plant, 1 km east of the Port, commenced production. Its storage tanks also contain massive quantities of several volatile, toxic, flammable and explosive substances. The size of the Dampier bomb Previous LNG disasters The future disaster at Dampier The liquid LNG, which consists almost entirely of methane, has a specific gravity of 1.5 and will on exposure to air boil over, much as boiling water does, rapidly expanding in volume and fracturing steel structures in its way through its extreme cold. Being at this stage much heavier than air, non-inflammable and non-explosive, it will flood the plant and flow to any low-lying areas, including the nearby sea. At the periphery of the developing methane cloud, where adequate oxygen is available, a flame membrane will heat up the methane and explode other tanks as the cloud expands. The rapidly forming cloud will be white, because air moisture would condense to water vapour through the cold methane. It will expand up to 600 times the volume of the tanks and blanket the surrounding land for many kilometres, with an eventual volume of around 400 cubic hectares (e.g. covering an area of 200 km2 or 16 km diameter 2 m deep). The rate and direction at which the methane diffuses depends primarily on the air temperature, air turbulence, and direction and strength of the wind. When the gas reaches its Lower Explosive Limit (mixed with air 5–14 % by volume), it is highly explosive, and ignition will occur at the periphery of the cloud almost as soon as the disaster occurs (e.g. from a flame tower, the initial explosion or any other potential source). The heat generated would be in the order of 2000–3000º C, first destroying the tensile strength of any steel (at 1200º C), then melting it (at 1600º C). As the methane cloud expands towards Dampier and Karratha, all living organisms, from humans to bacteria, will be first asphyxiated and frozen, then burnt. For many kilometres around the cloud, oxygen would be severely depleted as it is sucked into the firestorm, and where it’s level falls below 6 %, convulsions and death would occur in humans and other mammals. At levels of between 6–10 %, loss of consciousness would occur, and symptoms such as impaired respiration, permanent heart damage, nausea and vomiting would be still registered at 12.5 % (the normal oxygen content of air at sea level is 20.9 %). As the enormous quantities of methane burn, the population of Dampier and Karratha would probably perish even if not reached by the burning cloud, through oxygen depletion around the cloud. A methane cloud can travel for many kilometres, even hundreds of kilometres, especially unignited. In addition to these immediate primary effects, other effects of such a disaster would include the complete destruction of all Burrup industry, including that of Hamersley Iron/Rio Tinto, the harbour, and all jetties and ships in the area. The immediate damages would be well in excess of $30 billion, but the long-term damage to the economy of Australia would be far greater. It would include the effects of a complete collapse of the LNG network of Western Australia, and the loss tax revenue, international sales and markets, labour redundancies across the state, losses to contractors and suppliers, and compensation claims from dozens of iron ore, salt and LNG customers throughout the world. The disaster would also cause the breakdown of the state’s electricity grid (as gas-powered generators would be shut down indefinitely), and the cost of disaster relief and long-term social security needs. Thus the total cost can be safely assumed to be in the order of 10,000 human lives and hundreds of billions of dollars to the economy. The reason for this, the greatest industrial disaster in human history, is the insistence of the government to place all these volatile plants, which present ideal terrorist targets, in one single location, thus creating the Dampier bomb. In addition to the devastation of the Dampier industrial complex and the state’s economy, a major explosion at Dampier could also cause a tsunami that would affect the west coast of the continent and southern coasts in the Indonesian archipelago. The emissions of Dampier industry Previously claimed emissions of NOx were: 1,300,000 kg in 1999, 6,800,000 kg in 2000, 5,800,000 kg in 2001, 11,000,000 kg in 2002, 12,000,000 kg in 2003 and 2004. The production of the facility has steadily increased over these years, therefore the severe irregularities in some of these quantities need to be explained. In March 2003, Woodside admitted that it had lied about the NOx quantity, which explains the doubling in the 2002 report. The 1999 values are also entirely unrealistic and the benzene quantities remain probably false. The facility has been Australia’s largest air polluter for over 25 years (4). Other industry The effects of the Dampier emissions The greatest concern for the preservation of the rock art of Dampier are the acidic emissions, most especially the oxides of nitrogen. They form nitric acid on contact with moisture, which then leaches the principal cations from the mineral accretion covering all rock surfaces, particularly iron and manganese. This results in the bleaching of this patina, which has taken many millennia to form and which is very sensitive to reduction of precipitation pH. The gradual but eventually complete destruction of the petroglyphs is rendered inevitable by this process. Deterioration of the mineral crust has been measured since the late 1960s, and has accelerated significantly since the late 1980s (5). The Dampier emissions are recorded as light to medium, sometimes heavy rainfall on the local rain radar facility every day of the year, even if there are no clouds within a thousand kilometres. It is predicted that the rock art will begin to disappear during the present century, just as its makers did during the 19th century. The acidification of the natural environment also has other consequences, among them the destruction of the nearby coral reef and other components of the delicate environment. Summary The government’s lack of concern over the extremely high level of carcinogenic emissions is likely to lead to major compensation claims in the long term. The government’s determination to add significantly to the already dangerously high concentration of toxic, volatile, flammable and explosive stockpiles at Dampier is particularly hard to understand. It indicates an inability to comprehend the severity of these planning mistakes. There are numerous alternative sites available for all future developments along the coast, and the need for such alternative industrial nodes is in any case inevitable. There is thus no need to prolong the destruction of the Dampier Cultural Precinct any further. Only one factor prevents the state government from discontinuing the destruction of the Dampier monument: its unwillingness to concede that its decision to allocate $185 million to infrastructure at Dampier was a mistake. Nearly all industrial proponents have now rejected Dampier as a viable site for their developments, including BHP Billiton, Methanex, Syntroleum and DME Japan, and no new ones are likely to be lured to Dampier. The Gallop plan for Dampier is a disaster in every possible sense. Acknowledgment Robert G. Bednarik REFERENCES October 2006 |